To carry out the installation was necessary:
- Celosia metal supports.
- Galvanized metal crosshairs
- A galvanized metal profile.
- For l.A.M.T. with LA-56 driver (S/C)
- Tie chain U70 YB 20 (LA-56) with elongated
- U70PP20 composite insulators for bridges. o CCVH Poster. o XS fuse cutter, 24 KV
- SELA U 24/III unipolar disconnectors
- Auto valvular lightning rods
- Equipotential ring
- Lined with bridges
- Lined with staples, hardware and other accessories
- Insulating cover for unipolar disconnectors
- Medium-voltage junction jobs.
For the transformation center
- PREfabricated CTC concrete building
- C.T. Perimeter Steel
- 250 kVA transformer
- Cable kit for bridges B.T. 240 mm2 Al 1xF+1xN
- Protective equipment and indirect measure
- Grounding for protection and service
- Safe working procedures plate and first aid indicator